Optimize your electricity distribution investments
The future of investment management starts here. Manage your electricity distribution investments with GeoEner using intelligent algorithms and real-time data analytics. From subscriber applications and KET requests to projects, tender groups, progress payments and EPDK/TESAŞ reports, the whole process runs on one map; the Investment Performance screen shows stage durations and schedule and cost compliance while work is still in progress.
End-to-end
Process Tracking
Real-time
Data Analytics
Maximum
Reliability
Watch our comprehensive demo to see how our investment management system can transform your electricity distribution operations.
Powerful features developed for comprehensive investment management
Track your investment performance in real-time with comprehensive graphics and map-based displays.
Instant processing of requests coming through the subscriber management system.
By making a simple drawing in the relevant area, all requests within the institution are collected in a single center.
KET request management module with field analysis, surveyor assignment, group inclusion, and implementation processes.
Displacement request management module with field analysis, group inclusion, and implementation processes.
Project drawing, project management, easy estimate creation, protocol creation, modification project, MIF file import, temporary acceptance, final acceptance, energization.
Detailed information and tracking system for all projects taken into investment.
Creating contract unit prices from estimate tables, warehouse tracking, cost analysis.
Easy drawing tool, MIF file upload (geographic and data).
Easy drawing tool, version management, control screens, sending to progress payment unit.
Status determination, interruption, block, revised price, work increase, customized templates.
Automatic generation of EPDK and TESAŞ reports.
Takeover of existing facilities and repayment of user-built facilities: inventory taken over on the map, CPI-indexed transfer value, expropriation, field realization on the tablet, payment schedules and installment plans.
Price adjustment is calculated from price indices with the formula in the Turkish rules on price adjustment for construction works; the breakdown is saved and frozen on the progress payment and carried to its cover pages. VAT withholding follows the rate chosen for the tender group, and the last completed progress payment can be reopened with permission.
Transformers and panels are drawn as symbols with ports; a line connects only to a port with a matching voltage, and the cell–line mapping is set up automatically. The Outage Scenario, Search Network and Trace Network tools calculate de-energized elements, the number of affected customers, the feeding path and an outage announcement list by neighborhood and street, without changing any record.
Construction reports, institutional opinions, approval and revisions, estimate versions and the delivery package are tracked in one flow; design rules, provisional acceptance documents, the signature declaration, short-circuit calculation and per-characteristic project structure and ledger account mapping are kept on the same project.
Estimate comparison, the tender group project list, entry of materials without a price, price adjustment coefficients and withholding rates, and an announcement report at the end of the provisional acceptance report.
ESDF forms are calculated in a single wizard by implementation year, tender group and province; the report, including the ESDF-06-Y Annex-2 current expenditure and Current Summary forms, is saved with its breakdown and can hold several Excel outputs.
Mobile solutions specially developed for field teams
Ability to make detailed drawings in the field and mark on the map.
Ability to work without internet connection.
CORS device integration for high-precision positioning.
Special drawing tools for site delivery operations in the field.
Surveyor assignment and automatic notification system.
Performing dismantling operations using GIS data.
Creating and managing site delivery estimates in the field.
Creating field measurement drawings by performing status determination.
Instant access and viewing of GIS asset information.
Adding location-controlled photos, videos, images, documents and notes.
Work restrictions in specific regions with authorization control.
Managing and editing map layers.
Real-time display of own location and CORS location with inventory.
Recording media files with location information.
Detection and correction of errors in GIS inventory.
In Article 21 and Article 37 works, the assigned control engineer and surveyor draw the field realization on the tablet while seeing the estimate drawing on a separate layer; estimate elements can be converted into the field drawing, and work steps are shown in the list.
Seamless integration with your existing systems and comprehensive reporting
Transfer of institution inventories to YYS system together with map data and transfer of inventories created by YYS to GIS in accordance with rules.
Reservation, stock control, material consumption, scrap warehouse, material reconciliation operations.
Fully integrated operation for transferring data prepared through the system to TEDAŞ infrastructure.
Fully compatible reporting system with EPDK ready tables.
E-signature integration for documents that need to be approved in the system with token-independent E-signature integration.
Subscriber applications are transferred directly to the system, status changes of records processed by YYS are sent instantly to the Subscriber Management System.
Process integration with interruption management systems used in the institution for work creation, interruption approval, interruption start, interruption end (OMS, E-maintenance).
Integration with vehicle tracking systems actively used in the market (Ready Arvento integration).
Full integration and data transfer with EPDK EDWARS system.
CPI and domestic PPI values are imported from the Central Bank's EVDS service; progress payment price adjustment and facility transfer values are calculated from these indices.
Uninterrupted service and continuous development guarantee
Uninterrupted service with always accessible technical support team.
Service quality and solution times are guaranteed.
Flexible support solutions according to needs.
Continuous development with system improvements and new features.
Users open support requests from the web and tablet apps with screenshots and attachments; topic owners and requesters are notified by in-app notification, e-mail and SMS, resolved requests are rated, and support reports are available.
Our investment management system is trusted by major electricity distribution companies across Turkey.

Kayseri and Surrounding Areas Electricity Inc.

Aras Electricity Distribution Inc.
The Investment Management System brings every step of a distribution investment, from the initial request to reporting, onto a single platform. It covers subscriber applications, investment requests, KET and displacement requests, project management and investment project tracking, tender groups, site delivery, attachments and progress payments. EPDK and TESAŞ reports are also generated automatically by the system.
In the Project Management Module you draw the project, create estimates and protocols, prepare modification projects or import MIF files, and follow temporary acceptance, final acceptance and energization. Tender groups turn estimate tables into contract unit prices, with warehouse tracking and cost analysis. Attachment groups go through version management and control screens before being sent to the progress payment unit. Progress payments then handle status determination, deductions, blocks, revised prices and work increases using customized templates.
The system integrates with GIS, SAP, TEDAŞ KeyPos, EPDK EDWARS, e-signature, the Subscriber Management System, outage management systems (OMS, E-maintenance) and vehicle tracking systems. GIS integration works both ways: institutional inventory is imported together with map data, and inventory created in the system is transferred back to GIS in line with the rules. On the SAP side, reservation, stock control, material consumption, scrap warehouse and material reconciliation are supported, and the e-signature integration is token-independent.
Field teams can make detailed drawings on the map and create site delivery drawings and site delivery estimates on site. They can produce field measurement drawings through status determination, carry out dismantling using GIS data, and detect and correct faulty GIS inventory. CORS device integration provides high-precision positioning, and location-controlled photos, videos, documents and notes can be attached.
Yes. The GeoEner Facility Transfer module runs the takeover of existing facilities (Article 37) and the repayment of user-built facilities (Article 21) on the map, estimate, document and workflow infrastructure of Investment Management. Take Over on the map moves inventory into the estimate, and the transfer value is calculated with CPI indexing and facility age; the job then goes through expropriation, field realization on the tablet and progress payment. For Article 21, the installment schedule and the EK-2 and EK-3 tables are also produced by the system.
Request a free demo to see how the Investment Management System can benefit your business and examine our solutions up close.
Trusted By