Permit to Work, Lock-Out/Tag-Out and Certification Tracking
Health and safety for plant work: permits for working at height, electrical isolation, hot work, confined space, lifting and underwater work, sequenced lock-out/tag-out with zero-energy verification, and personnel certification tracking. A work order cannot start until the conditions are met.
GeoEner EAM HSE and Permit to Work ties safety conditions to the work order flow. Maintenance plans and work orders carry the permit types that must be approved before work starts: working at height, electrical isolation, hot work, confined space, lifting and underwater work. Ready maintenance templates come with these permits; for example turbine service requires working at height and electrical isolation.
A work permit is requested on the work order, recording the permit form number, precautions and validity period. The requester and the approver are different people; rejection requires a reason and a note is taken at closing. An approved permit allows work to start only within its validity period; a second active permit of the same type cannot be opened, and permits cannot be requested for closed work orders.
For lock-out/tag-out, energy isolation points such as breakers, disconnectors, valves or rotor locks are added to the work order in sequence, with the energy type (electrical, mechanical, hydraulic or pneumatic) and the equipment in the asset tree. A point is locked with a lock number, and a person other than the one who locked it verifies zero energy with a measurement and instrument note. Work cannot start until every point is verified; restoration happens in reverse order, and work cannot be completed or cancelled until every point is restored.
In certification tracking, the tenant defines certificate types such as GWO working at height or an electrical authorization certificate, their validity period and the permit types they cover. Personnel certificates are kept with certificate number, issuer, issue date and expiry date; a renewal opens a new record and the old one stays in history. Expiring and expired certificates are listed. If the person doing the work lacks a valid certificate for every permit type the job requires, the work order cannot start.
Health and safety for plant work: permits for working at height, electrical isolation, hot work, confined space, lifting and underwater work, sequenced lock-out/tag-out with zero-energy verification, and personnel certification tracking. A work order cannot start until the conditions are met.
Module by module.
Maintenance plans and work orders carry the permit types that must be approved before work starts. A work order raised from a plan inherits the list; ready templates define permits such as working at height and electrical isolation for turbines, or underwater work for a hydro intake inspection.
A permit is requested on the work order with the permit form number, precautions (isolation, personal protective equipment, watch person) and validity period. The requester and approver are different people; the approval or rejection note, decision time and closing note are recorded.
An approved permit allows work to start only within its validity window. A second active permit of the same type cannot be opened, and permits cannot be requested for a closed work order. The work order list shows whether permits are ready.
Energy isolation points such as breakers, disconnectors, valves or rotor locks are added to the work order with a sequence number, recording the electrical, mechanical, hydraulic or pneumatic energy type and, if present, the equipment in the asset tree. Each point is locked with the number of the lock or tag applied.
A locked point is verified by a person other than the one who locked it, with a measurement value and instrument note. Work cannot start until every point is verified.
Restoration happens in reverse lock order and is recorded with a note. Work cannot be completed or cancelled until every point is restored, so the plant is never handed back with equipment still locked.
The tenant defines certificate types such as GWO working at height or an electrical authorization certificate. The type holds the validity period used when no expiry date is entered and the permit types the certificate qualifies for; inactive types are not checked.
Each certificate is recorded with certificate number, issuer, issue and expiry dates; its status is calculated as valid, expiring soon, expired or not yet valid. A renewal opens a new record. If the assignee lacks a valid certificate for the required permit types, work cannot start.
Required permits are set on plans and work orders, and certificate types with the permits they cover on the tenant.
The permit is requested with precautions and a validity window; another person approves or rejects it with a reason.
Isolation points are locked in sequence and a second person verifies zero energy.
The work order starts once permit, certificate and isolation conditions are met.
Points are restored in reverse order and the permit is closed; then the work can be completed.
Embed permit, lock-out/tag-out and certificate rules in the workflow and see who did each step.
Follow permit and isolation status on the work order for work at height, in confined spaces and underwater.
Check contractor personnel's certificates and permits under the same rules.
There are six permit types: working at height, electrical isolation, hot work, confined space, lifting and underwater work. Maintenance plans and work orders carry the permit types that must be approved before work starts, and ready maintenance templates come with them defined. The requester and approver of a permit must be different people.
Energy isolation points are added to the work order with a sequence number, energy type and, if present, the equipment in the asset tree. A point is locked with a lock or tag number, and a person other than the one who locked it verifies zero energy with a measurement and instrument note. Work cannot start until every point is verified; restoration happens in reverse order, and work cannot be completed or cancelled until every point is restored.
The tenant defines certificate types such as GWO working at height or an electrical authorization certificate, and the permit types each one qualifies for. If the assignee lacks a valid certificate for every permit type the work order requires, the work cannot start. A permit type requires a certificate only when an active certificate type covering it is defined.
On the Certification Tracking screen, each certificate's status is calculated as valid, expiring soon, expired or not yet valid, and expiring certificates are listed. A renewal opens a new record and the old one stays as history. If no expiry date is entered, the validity period of the certificate type is used.
All products run on the same map, the same authorization model and the same asset records.
EAM · Maintenance Planning
Calendar and Counter-Based Preventive Maintenance
View detailsEAM · Work Orders & Failures
Plant Work Orders, Failure Records and Service Reports
View detailsEAM · Contractors & SLA
Service Contracts, SLA and Contractor Work Sharing
View detailsInvestment Management
Optimize your electricity distribution investments
View detailsMaintenance Management
Digitize your asset maintenance processes
View detailsInvestment Management · Performance
Duration, Schedule and Cost Measurement for Investments
View detailsMaintenance Management · Performance
Maintenance Duration, Efficiency and Staff Scorecards
View detailsInspection Management
Inspection Management: Drone and AI Grid Inspection
View detailsPower Quality
Power Quality Management Software
View detailsGrid Monitoring
Power System Management
View detailsOutage Management
Outage & EPDK Reporting
View detailsFacility Transfer · Art. 37 / 21
Article 37 Facility Transfer and Article 21 User-Built Facilities
View detailsGIS · Network Topology
Network Inventory, Topology and Feeder Management
View detailsDigital Twin · 3D
3D Grid Twin and Scenario Analysis
View detailsEngineering Analysis
Line Project Engineering Calculations
View detailsBusiness Intelligence
Management Dashboard, Benchmarking and Monitoring
View detailsField Operations
AKIM Field Management Application
View detailsFault Management
Fault Reporting and Response Management
View detailsEAM · Asset Registry
Plant Asset Registry and Warranty Tracking
View detailsEAM · Reliability
Downtime Records, Availability and SCADA Connection
View detailsEAM · Stock & Spare Parts
Plant Warehouses, Consumables and Spare Components
View detailsTrusted By