Service Contracts, SLA and Contractor Work Sharing
Manages work between plant owners and O&M contractors or manufacturers in one flow: scoped service contracts, response and resolution times per priority, SLA targets and risk tracking on each work order, SLA compliance per contract, sharing work orders with the contractor's tenant and choosing which fields the contractor sees.
GeoEner EAM Contractors and SLA links the plant owner's maintenance service contracts with O&M contractors and manufacturers to work orders. A contract is recorded with its number, start and end dates; the sites and asset types it covers are selected, and if left empty it covers the whole tenant. Response and resolution times are defined in calendar hours for each work order priority.
When a work order is opened, the most specific valid contract that matches the asset's site and type and has a rule for its priority is selected. The SLA clock starts when the work order is opened, and the deadlines for starting work and for technical completion are written to the work order. Each target is tracked as on track, at risk, breached or met; work orders can be filtered by SLA status, and the dashboard counts breached and at-risk jobs per site. The contract summary gives response and resolution breaches, open at-risk jobs and SLA compliance for work orders opened in a chosen period.
If the contractor also uses GeoEner EAM, the contractor's tenant is linked to the contract and work orders under that contract are shared with the contractor. On the Contractor Work Orders screen, the contractor starts and completes work, requests work permits, locks and restores isolation points, fills in checklists with photos and signatures, and downloads the service report. Acceptance, rejection, cancellation, zero-energy verification and isolation point definition stay with the plant owner; actions run in the owner's tenant under the owner's rules. Per contract, the owner chooses which of description, SLA targets, materials, status notes, asset serial number and manufacturer/model the contractor can see.
Tenant administrators can define webhook subscriptions that send work order status changes, failures, downtime, SLA breaches and overdue maintenance to external systems via signed HTTP POST; failed deliveries are retried at increasing intervals. Integration secrets are stored encrypted.
Manages work between plant owners and O&M contractors or manufacturers in one flow: scoped service contracts, response and resolution times per priority, SLA targets and risk tracking on each work order, SLA compliance per contract, sharing work orders with the contractor's tenant and choosing which fields the contractor sees.
Module by module.
A maintenance contract with a contractor or manufacturer is recorded with its number, start and end dates. Covered sites and asset types are selected, and if empty the whole tenant is covered; an inactive contract is not assigned to new work orders, and a contract used on a work order cannot be deleted.
For low, normal, high and urgent priorities, the response time from opening to start and the resolution time to technical completion are defined in hours. Each priority has a single rule.
When a work order is opened, the most specific contract matching the asset's site and type is selected, the most recently started one on a tie. Response and resolution deadlines are written to the work order and appear as an SLA section in the service report.
Each target is calculated as on track, at risk, breached or met; an open target is at risk once a set share of its time has elapsed. Work orders can be filtered by SLA status, and breached and at-risk jobs are shown per site on the dashboard.
For work orders opened in a chosen period, each contract shows work order count, response breaches, resolution breaches, open at-risk jobs and SLA compliance. SLA compliance is also an indicator in GeoEner Business Intelligence.
Once the contractor's EAM tenant is linked to the contract, work orders under the contract are opened to the contractor. The contractor starts and completes work, requests permits, locks and restores isolation points, fills in the checklist and downloads the service report; acceptance, rejection, cancellation and verification stay with the owner. Work from a suspended owner is closed to the contractor.
For each contract, the owner chooses which of description, SLA targets, materials, status notes, asset serial number and manufacturer/model are visible. The selection applies to the work order, history, material list and service report; manufacturer and model are shown only when explicitly selected.
Tenant administrators define webhook subscriptions for work order status changes, failures opened or changed, downtime start and end, SLA breaches and overdue maintenance. Events are sent via signed HTTP POST; failed deliveries are retried at increasing intervals, can be redelivered manually, and the secret can be rotated and is stored encrypted.
Covered sites, asset types and SLA times per priority are defined.
The contractor's EAM tenant is linked and visible fields are selected.
When a work order opens, the matching contract is selected and response and resolution deadlines are written.
The contractor runs the job from its own screen; acceptance and verification stay with the owner.
Periodic SLA compliance is tracked in the contract summary and Business Intelligence; breaches are notified via webhook.
Track the SLA commitments of O&M contracts per work order, with periodic compliance and breaches.
See work from several plant owners on one screen; each owner's rules and data stay separate.
Carry out warranty and service contract work with only the shared fields.
The service contract defines response and resolution times in hours for each work order priority. When a work order is opened, the most specific valid contract matching the asset's site and type is selected; the clock starts at opening, and the deadlines for starting work and for technical completion are written to the work order. Each target is tracked as on track, at risk, breached or met.
If the contractor also uses GeoEner EAM, its tenant is linked to the contract and work orders under the contract appear on the Contractor Work Orders screen. The contractor starts and completes work, requests work permits, locks and restores isolation points, fills in the checklist and downloads the service report. Acceptance, rejection, cancellation, zero-energy verification and isolation point definition stay with the plant owner.
For each contract, the plant owner chooses which of description, SLA targets, materials, status notes, asset serial number and manufacturer/model are shared with the contractor. The selection applies to the work order, history, material list and service report; manufacturer and model are shown only when explicitly selected. Owner and contractor data stay isolated in separate tenants.
Yes. Tenant administrators can define webhook subscriptions for work order status changes, failures, downtime start and end, SLA breaches and overdue maintenance. Events are sent via signed HTTP POST, failed deliveries are retried at increasing intervals and can be redelivered manually. The contract summary also shows SLA compliance and breaches per period.
All products run on the same map, the same authorization model and the same asset records.
Business Intelligence
Management Dashboard, Benchmarking and Monitoring
View detailsEAM · Work Orders & Failures
Plant Work Orders, Failure Records and Service Reports
View detailsEAM · HSE & Permit to Work
Permit to Work, Lock-Out/Tag-Out and Certification Tracking
View detailsEAM · Reliability
Downtime Records, Availability and SCADA Connection
View detailsInvestment Management
Optimize your electricity distribution investments
View detailsMaintenance Management
Digitize your asset maintenance processes
View detailsInvestment Management · Performance
Duration, Schedule and Cost Measurement for Investments
View detailsMaintenance Management · Performance
Maintenance Duration, Efficiency and Staff Scorecards
View detailsInspection Management
Inspection Management: Drone and AI Grid Inspection
View detailsPower Quality
Power Quality Management Software
View detailsGrid Monitoring
Power System Management
View detailsOutage Management
Outage & EPDK Reporting
View detailsFacility Transfer · Art. 37 / 21
Article 37 Facility Transfer and Article 21 User-Built Facilities
View detailsGIS · Network Topology
Network Inventory, Topology and Feeder Management
View detailsDigital Twin · 3D
3D Grid Twin and Scenario Analysis
View detailsEngineering Analysis
Line Project Engineering Calculations
View detailsField Operations
AKIM Field Management Application
View detailsFault Management
Fault Reporting and Response Management
View detailsEAM · Asset Registry
Plant Asset Registry and Warranty Tracking
View detailsEAM · Maintenance Planning
Calendar and Counter-Based Preventive Maintenance
View detailsEAM · Stock & Spare Parts
Plant Warehouses, Consumables and Spare Components
View detailsTrusted By