Maintenance Duration, Efficiency and Staff Scorecards
The measurement screen of GeoEner Maintenance Management: actual maintenance durations from the tablet maintenance form, organization, province and department norms, a reference time adjusted for distance, findings and crew size, efficiency, anomaly review, person and crew scores, and a staff scorecard with supervisor evaluation.
GeoEner Maintenance Performance is the Maintenance Performance screen under GeoEner Maintenance Management; it is a measurement module that runs on the maintenance records. Maintenance duration is taken from the moments the maintenance form is opened and saved on the tablet; the device clock's drift from the server is corrected, and server times are used when there is no device time. Durations outside the lower and upper limits, such as those from a bulk offline sync or a form left open, are treated as invalid. The time between consecutive maintenance jobs by the same crew is calculated per crew as the cycle time.
A nightly calculation summarizes new maintenance records, updates cycle times and recalculates the current month's duration norms (median and quartiles) per maintenance form at organization, province and department level; norms of previous months do not change. A job's reference time is first taken from the form's target cycle time or from the closest norm with enough samples (department, then province, then organization), and then adjusted by multipliers for bands of distance between equipment, number of findings and crew size. The multipliers are learned from actual maintenance jobs using the median log ratio, default to 1 in bands without enough samples, and are shown in the Duration Multipliers table on the Norms and Targets tab.
Efficiency is the ratio of reference time to actual time. Long cycles, short durations, forms filled far from the equipment, off-hours records and device clock drift are flagged as anomalies; a supervisor can close an anomaly with a reason of Difficult Terrain, Additional Fault, Incorrect Record, Travel or Other, or confirm it. The anomaly rate is the share of anomalies without a justification. The score is a weighted average of efficiency and quality (100 minus the anomaly rate) with adjustable weights; it is calculated daily, weekly or monthly for a person or a crew, ranked within the department, and compared with the previous day, week, month or year and with organization and department efficiency.
The Staff Performance Scorecard combines maintenance efficiency, the average of the supervisor's monthly evaluation scores and a fault component with adjustable weights. The fault component scores the change in the number of faults in the districts where the person did maintenance compared with a year earlier: 50 for no change, 100 if faults disappear, 0 if they double. The weight of a component that cannot be calculated is spread over the others; maintenance form success is shown for information only. The module is in use in GeoEner Maintenance Management.
The measurement screen of GeoEner Maintenance Management: actual maintenance durations from the tablet maintenance form, organization, province and department norms, a reference time adjusted for distance, findings and crew size, efficiency, anomaly review, person and crew scores, and a staff scorecard with supervisor evaluation.
Module by module.
Duration is taken from the moments the maintenance form is opened and saved on the tablet; the device clock's drift from the server is corrected, and server times are used for records without device time. Durations outside the lower and upper limits, such as a bulk offline sync or a form left open, are treated as invalid and excluded from norms.
The time between two consecutive maintenance jobs by the same crew is calculated per crew as the cycle time, so travel and preparation are part of the measurement. If a late-synced record slots in, that crew-day's cycles are recalculated; gaps above the upper limit, such as breaks, are excluded from the cycle norm.
The nightly calculation summarizes new records and rewrites the current month's duration norms per maintenance form at organization, province and department level with the median and quartiles; norms of previous months do not change. On the Norms and Targets tab, norms are shown next to the form's target cycle time.
The reference time is first taken from the form's target cycle time or from the closest norm with enough samples (department, province, organization). It is then adjusted by multipliers for distance between equipment (4 bands), number of findings (3 bands) and crew size (3 bands). The multipliers are learned from actual jobs using the median log ratio, default to 1 with too few samples, and are shown in the Duration Multipliers table.
Long cycles, short durations, forms filled far from the equipment, off-hours records and device clock drift are flagged as anomalies. A supervisor closes each anomaly with a reason of Difficult Terrain, Additional Fault, Incorrect Record, Travel or Other, or confirms it; the anomaly rate is the share of anomalies without a justification.
Efficiency is the ratio of reference time to actual time and enters the score capped at 100. The score is a weighted average of efficiency and quality (100 minus the anomaly rate); the default weights are 0.7 and 0.3 and can be adjusted per installation. No score is shown for a period without enough measured cycles.
Scores are calculated daily, weekly or monthly for a person or a crew and ranked within the department. Each value is compared with the previous day, week, month or year, with organization and department efficiency shown alongside as benchmarks. The dashboard gives the period summary.
The evaluation score is a weighted average of maintenance efficiency, the average of the supervisor's monthly scores entered on the Supervisor Evaluation screen, and a fault component (defaults 0.5, 0.25 and 0.25; adjustable). The fault component reflects the change in faults in the districts where the person did maintenance compared with a year earlier: 50 for no change, 100 if faults disappear, 0 if they double. The weight of a component that cannot be calculated is spread over the others; maintenance form success is for information only.
Maintenance duration is taken from the form's open and save moments on the device; offline records arrive on sync.
Records are summarized, crew cycles updated, and organization, province and department norms recalculated.
The target or norm is adapted to the job's conditions with distance, findings and crew size multipliers.
The supervisor closes flagged jobs with a reason or confirms them; the quality score follows.
Person and crew scores are ranked; with the monthly supervisor score, the Staff Performance Scorecard is produced.
See actual durations, norms and efficiency differences between departments per maintenance form on one screen.
Review anomalies with a reason, follow crew scores and enter the monthly evaluation score.
Use a staff scorecard that combines efficiency, supervisor judgment and fault trends, with weights set for your organization.
Duration is taken from the moments the maintenance form is opened and saved on the tablet, and the device clock's drift from the server is corrected. Server times are used for records without device time. Durations outside the lower and upper limits, such as a bulk offline sync or a form left open, are treated as invalid and excluded from norms. The time between consecutive jobs by the same crew is also calculated as the cycle time.
No. The reference time is first taken from the form's target cycle time or from the closest norm with enough samples (department, then province, then organization). It is then adjusted by multipliers for distance between equipment (4 bands), number of findings (3 bands) and crew size (3 bands). The multipliers are learned from actual jobs using the median log ratio, default to 1 in bands without enough samples, and are shown in the Duration Multipliers table.
Long cycles, short durations, forms filled far from the equipment, off-hours records and device clock drift are flagged as anomalies. A supervisor can close an anomaly with a reason of Difficult Terrain, Additional Fault, Incorrect Record, Travel or Other, or confirm it. The anomaly rate is the share of anomalies without a justification and sets the quality component of the score (100 minus the anomaly rate).
It combines maintenance efficiency, the average of the supervisor's monthly scores entered on the Supervisor Evaluation screen, and a fault component with adjustable weights (defaults 0.5, 0.25 and 0.25). The fault component reflects the change in faults in the districts where the person did maintenance compared with a year earlier: 50 for no change, 100 if faults disappear, 0 if they double. The weight of a component that cannot be calculated is spread over the others; maintenance form success is shown for information only.
All products run on the same map, the same authorization model and the same asset records.
Maintenance Management
Digitize your asset maintenance processes
View detailsInvestment Management · Performance
Duration, Schedule and Cost Measurement for Investments
View detailsBusiness Intelligence
Management Dashboard, Benchmarking and Monitoring
View detailsField Operations
AKIM Field Management Application
View detailsInvestment Management
Optimize your electricity distribution investments
View detailsInspection Management
Inspection Management: Drone and AI Grid Inspection
View detailsPower Quality
Power Quality Management Software
View detailsGrid Monitoring
Power System Management
View detailsOutage Management
Outage & EPDK Reporting
View detailsFacility Transfer · Art. 37 / 21
Article 37 Facility Transfer and Article 21 User-Built Facilities
View detailsGIS · Network Topology
Network Inventory, Topology and Feeder Management
View detailsDigital Twin · 3D
3D Grid Twin and Scenario Analysis
View detailsEngineering Analysis
Line Project Engineering Calculations
View detailsFault Management
Fault Reporting and Response Management
View detailsEAM · Asset Registry
Plant Asset Registry and Warranty Tracking
View detailsEAM · Maintenance Planning
Calendar and Counter-Based Preventive Maintenance
View detailsEAM · Work Orders & Failures
Plant Work Orders, Failure Records and Service Reports
View detailsEAM · HSE & Permit to Work
Permit to Work, Lock-Out/Tag-Out and Certification Tracking
View detailsEAM · Reliability
Downtime Records, Availability and SCADA Connection
View detailsEAM · Contractors & SLA
Service Contracts, SLA and Contractor Work Sharing
View detailsEAM · Stock & Spare Parts
Plant Warehouses, Consumables and Spare Components
View detailsTrusted By