Facility Transfer · Art. 37 / 21

GeoEner Tesis Devri

Article 37 Facility Transfer and Article 21 User-Built Facilities

Manages end to end the takeover of existing facilities under Article 37 and the repayment of user-built facilities under Article 21 of the Turkish Connection and System Usage Regulation: inventory takeover on the map, estimates and transfer value, expropriation, field realization on the tablet, payment schedules and installment plans.

GeoEner Facility Transfer runs two separate processes of the Turkish Electricity Market Connection and System Usage Regulation in one module, on separate screens. In Article 37 works, an operating facility registered to someone else is taken over by the distribution company and its value is paid to the owner. In Article 21 works, the user designs and builds the facility on behalf of the distribution company and is repaid in installments. Both processes use the map, estimate, document and workflow infrastructure of Investment Management, and each is switched on per installation by a parameter.

A job moves through Request → Preparation → Expropriation → Realization → Progress Payment → Completed; each transition can be tied to approval steps in a workflow template, sending a job back requires an explanation, and a completed record cannot be changed. An Article 37 request is opened with one of the justification classes defined in the regulation. The Take Over tool on the map splits the network equipment that actually intersects the drawn area into line and point groups and adds them to the estimate with suggested quantities, and the inherited inventory is listed separately. The estimate is priced with TEDAŞ positions, an overhead line km template or a lump sum. The transfer value is calculated by indexing unit prices with CPI and reducing them by facility age (1 − n/30); a facility older than 30 years is taken over at a nominal value. A payment schedule is produced per owner: if the public interest decision or permit was obtained after the protocol, the value is indexed with CPI from the start of use to the decision date and payment moves to the following year.

In the expropriation stage, the public interest decision, consent and permit details and the decision file are recorded; a job cannot be sent to realization without the decision file, mandatory documents and a field team. The estimate drawing is locked together with its value at this point. The field realization is drawn on the GeoEner tablet app by the assigned control engineers and surveyors, with the estimate drawing shown as a separate layer; before it is marked ready for provisional acceptance, the drawing is checked for mandatory fields and compared with the estimate. For Article 21, the repayment schedule is built from the agreement date, guarantee dates are calculated, and project, expropriation file and permit costs are entered as additional items; the annual EK-2 and EK-3 tables and progress payment reports in the organization's template are produced by the system.

Article 37 facility transfer and Article 21 user-built facilities in one module
2 articles
Article 37 facility transfer and Article 21 user-built facilities in one module
Request, preparation, expropriation, realization, progress payment, completed
6 stages
Request, preparation, expropriation, realization, progress payment, completed
TEDAŞ positions, overhead line km template or lump sum for estimates
3 sources
TEDAŞ positions, overhead line km template or lump sum for estimates
Facilities older than this are taken over at a nominal value
30 years
Facilities older than this are taken over at a nominal value
Video

GeoEner Tesis Devri at a Glance

Manages end to end the takeover of existing facilities under Article 37 and the repayment of user-built facilities under Article 21 of the Turkish Connection and System Usage Regulation: inventory takeover on the map, estimates and transfer value, expropriation, field realization on the tablet, payment schedules and installment plans.

Capabilities

What GeoEner Tesis Devri does

Module by module.

  • request · approval · stage

    Transfer requests and workflow

    An Article 37 request is opened on grounds of national security, shared use, capacity increase or other network use, and is approved with a suitable-for-transfer decision or rejected with a reasoned note. Transitions to preparation, expropriation, realization, progress payment and completion can be tied to approval steps in a workflow template, and users see the records waiting for them separately.

  • Take Over · equipment · estimate

    Inherited inventory from the map

    The Take Over tool splits the network equipment that actually intersects the drawn area into line groups by conductor and drawing type and point groups by GIS material, suggesting the km inside the area for lines. Confirmed groups are written to the estimate as sections to be taken over, while manually added sections are kept. Transfer drawings are kept in map layers separate from preliminary projects.

  • TEDAŞ positions · km template · lump sum

    Estimates and price sources

    Estimate quantities come from the drawing with the same rules as preliminary project estimates, with removal rates applied to dismantling. Prices come from TEDAŞ positions for the chosen year, from an overhead line km template defined by conductor and pole type, or from a lump sum. A single item with no price does not stop the job from being sent to expropriation and progress payment.

  • CPI · 1 − n/30 · nominal value

    Article 37 transfer value and payment schedule

    The value is calculated in the order of the organization's form by indexing the transfer-year unit prices with CPI and reducing them by facility age; age is taken from the energization, provisional acceptance or connection agreement date, and a facility older than 30 years is taken over at a nominal value. The payment schedule is produced by owner share, and payments are recorded as direct, bank deposit or PTT deposit. The Transfer Protocol and the progress payment report follow the organization's template.

  • public interest · consent · permit

    Expropriation

    A job with a finished estimate is sent to the expropriation unit, which locks the estimate value and drawing. The expropriation screen records the public interest decision, consent and permit details and the public interest decision file. The job cannot move to field realization without the decision file, an explanation, mandatory documents and at least one assigned control engineer or surveyor.

  • tablet · field drawing · comparison

    Field realization

    Several control engineers and surveyors can be assigned to the field team. Assigned users see their jobs with their work steps in the Field Realization list of the GeoEner tablet app and draw the field realization while following the estimate drawing on a separate layer; estimate elements can be converted into the field drawing. Before it is marked ready for provisional acceptance, the drawing is checked for mandatory fields and locked, and the comparison screen shows the estimate and the realization side by side on the map.

  • installments · guarantee · EK-2 / EK-3

    Article 21 repayment

    Application details, the applicant's contact and IBAN details and the signed facility contract are recorded. The repayment schedule is built from the agreement date: at most eight months and six equal installments for agreements signed after 27 January 2026, and at most twelve installments within the year for earlier ones. Guarantee return and forfeiture dates are calculated, and project, expropriation file, highway, forest and excavation permit costs are entered as additional items. The final progress payment report and the annual EK-2 and EK-3 tables are downloaded from the system.

  • CPI · PPI · EVDS

    Price indices and accounting mapping

    CPI and domestic PPI values are imported from the Central Bank's EVDS service on the Price Indices screen, and value calculations and indexing read from this table. Article 37 Projects define the project structure element, general ledger account and transaction types per characteristic.

Process

How It Works

  1. 1

    Open — request

    The request is opened with its justification and moves to preparation through approval steps.

  2. 2

    Prepare — inventory and estimate

    Take Over moves the equipment in the area into the estimate, which is priced and the value calculated.

  3. 3

    Expropriate — decisions and permits

    The public interest decision, consent and permits are recorded, and the field team is assigned.

  4. 4

    Realize — field drawing

    The field team draws the realization on the tablet, and the drawing is checked and compared with the estimate.

  5. 5

    Pay — progress payment and completion

    The payment schedule or installment plan is prepared, reports are produced and the record is completed.

Key Benefits

  • The transfer value is calculated in the order of the organization's form, without separate spreadsheets
  • Inventory comes from existing GIS equipment and is not redrawn
  • Every stage is approved and traceable, and a completed record cannot be changed
  • The field team draws the realization on the tablet, and the difference from the estimate is visible in the office

Who Is It For?

  • Investment and project teams

    Run transfer and user-built facility jobs with inventory and estimates on the map, on the same infrastructure as investment projects.

  • Expropriation and legal teams

    Keep public interest decisions, consent and permit details and the decision file on the job itself.

  • Payment and accounting teams

    Get the transfer value, CPI indexing, installments and EK-2 / EK-3 tables from the system.

Specifications

Technical Specifications

Regulation
Calculation rules of Articles 21 and 37 of the Electricity Market Connection and System Usage Regulation and the related EPDK decisions
Stages
Request, Preparation, Expropriation, Realization, Progress Payment, Completed; Rejected
Pricing
TEDAŞ unit price positions (by year), overhead line km templates, lump sum
Indices
CPI and domestic PPI, imported from the Central Bank's EVDS
Outputs
Transfer Protocol, progress payment report in the organization's template, Article 21 final progress payment report, payment schedule (Excel), EK-2 / EK-3
Field
GeoEner tablet app: Field Realization list, estimate layer, field drawing
Platform
A module of Investment Management; Article 37 and Article 21 are switched on by separate parameters, with per-screen role permissions
FAQ

Frequently Asked Questions

What is the difference between Article 37 and Article 21 works, and are they managed on the same screen?

Under Article 37, an operating facility registered to someone else is taken over by the distribution company and its value is paid to the owner. Under Article 21, the user builds the facility on behalf of the distribution company and is repaid in installments. The two processes run on separate screens of the same module; each is switched on by its own parameter, and value and payment rules are calculated separately.

How is the Article 37 transfer value calculated?

The estimate is priced with TEDAŞ positions, an overhead line km template or a lump sum. The value is calculated in the order of the organization's form by indexing unit prices with CPI and reducing them by facility age (1 − n/30); a facility older than 30 years is taken over at a nominal value. If the public interest decision or permit was obtained after the protocol, the payment schedule indexes the value with CPI up to the decision date. Each calculation is stored as a separate version.

Where do expropriation and field realization fit in the flow?

A job with a finished estimate is sent to the expropriation unit, which locks the estimate value and drawing. Once the public interest decision, consent and permit details and the decision file are entered and a field team is assigned, the job moves to realization. Control engineers and surveyors draw the field realization on the GeoEner tablet app; after the drawing is checked and compared with the estimate, the job is sent to progress payment.

How is Article 21 repayment planned?

The repayment schedule is built from the agreement date: at most eight months and six equal installments for agreements signed after 27 January 2026, and at most twelve installments within the year for earlier ones. Guarantee return and forfeiture dates are calculated, and project, expropriation file and permit costs are entered as additional items. The final progress payment report and the annual EK-2 and EK-3 tables are produced by the system.

Product family

Other GeoEner Family Products

All products run on the same map, the same authorization model and the same asset records.

Trusted By

KÇETAŞ
ARAS
İGDAŞ
TCDD
MEB
İETT
HemenKurya
KÇETAŞ
ARAS
İGDAŞ
TCDD
MEB
İETT
HemenKurya
KÇETAŞ
ARAS
İGDAŞ
TCDD
MEB
İETT
HemenKurya

Ready to get started?

Start your free demo application today.