Article 37 Facility Transfer and Article 21 User-Built Facilities
Manages end to end the takeover of existing facilities under Article 37 and the repayment of user-built facilities under Article 21 of the Turkish Connection and System Usage Regulation: inventory takeover on the map, estimates and transfer value, expropriation, field realization on the tablet, payment schedules and installment plans.
GeoEner Facility Transfer runs two separate processes of the Turkish Electricity Market Connection and System Usage Regulation in one module, on separate screens. In Article 37 works, an operating facility registered to someone else is taken over by the distribution company and its value is paid to the owner. In Article 21 works, the user designs and builds the facility on behalf of the distribution company and is repaid in installments. Both processes use the map, estimate, document and workflow infrastructure of Investment Management, and each is switched on per installation by a parameter.
A job moves through Request → Preparation → Expropriation → Realization → Progress Payment → Completed; each transition can be tied to approval steps in a workflow template, sending a job back requires an explanation, and a completed record cannot be changed. An Article 37 request is opened with one of the justification classes defined in the regulation. The Take Over tool on the map splits the network equipment that actually intersects the drawn area into line and point groups and adds them to the estimate with suggested quantities, and the inherited inventory is listed separately. The estimate is priced with TEDAŞ positions, an overhead line km template or a lump sum. The transfer value is calculated by indexing unit prices with CPI and reducing them by facility age (1 − n/30); a facility older than 30 years is taken over at a nominal value. A payment schedule is produced per owner: if the public interest decision or permit was obtained after the protocol, the value is indexed with CPI from the start of use to the decision date and payment moves to the following year.
In the expropriation stage, the public interest decision, consent and permit details and the decision file are recorded; a job cannot be sent to realization without the decision file, mandatory documents and a field team. The estimate drawing is locked together with its value at this point. The field realization is drawn on the GeoEner tablet app by the assigned control engineers and surveyors, with the estimate drawing shown as a separate layer; before it is marked ready for provisional acceptance, the drawing is checked for mandatory fields and compared with the estimate. For Article 21, the repayment schedule is built from the agreement date, guarantee dates are calculated, and project, expropriation file and permit costs are entered as additional items; the annual EK-2 and EK-3 tables and progress payment reports in the organization's template are produced by the system.
Manages end to end the takeover of existing facilities under Article 37 and the repayment of user-built facilities under Article 21 of the Turkish Connection and System Usage Regulation: inventory takeover on the map, estimates and transfer value, expropriation, field realization on the tablet, payment schedules and installment plans.
Module by module.
An Article 37 request is opened on grounds of national security, shared use, capacity increase or other network use, and is approved with a suitable-for-transfer decision or rejected with a reasoned note. Transitions to preparation, expropriation, realization, progress payment and completion can be tied to approval steps in a workflow template, and users see the records waiting for them separately.
The Take Over tool splits the network equipment that actually intersects the drawn area into line groups by conductor and drawing type and point groups by GIS material, suggesting the km inside the area for lines. Confirmed groups are written to the estimate as sections to be taken over, while manually added sections are kept. Transfer drawings are kept in map layers separate from preliminary projects.
Estimate quantities come from the drawing with the same rules as preliminary project estimates, with removal rates applied to dismantling. Prices come from TEDAŞ positions for the chosen year, from an overhead line km template defined by conductor and pole type, or from a lump sum. A single item with no price does not stop the job from being sent to expropriation and progress payment.
The value is calculated in the order of the organization's form by indexing the transfer-year unit prices with CPI and reducing them by facility age; age is taken from the energization, provisional acceptance or connection agreement date, and a facility older than 30 years is taken over at a nominal value. The payment schedule is produced by owner share, and payments are recorded as direct, bank deposit or PTT deposit. The Transfer Protocol and the progress payment report follow the organization's template.
A job with a finished estimate is sent to the expropriation unit, which locks the estimate value and drawing. The expropriation screen records the public interest decision, consent and permit details and the public interest decision file. The job cannot move to field realization without the decision file, an explanation, mandatory documents and at least one assigned control engineer or surveyor.
Several control engineers and surveyors can be assigned to the field team. Assigned users see their jobs with their work steps in the Field Realization list of the GeoEner tablet app and draw the field realization while following the estimate drawing on a separate layer; estimate elements can be converted into the field drawing. Before it is marked ready for provisional acceptance, the drawing is checked for mandatory fields and locked, and the comparison screen shows the estimate and the realization side by side on the map.
Application details, the applicant's contact and IBAN details and the signed facility contract are recorded. The repayment schedule is built from the agreement date: at most eight months and six equal installments for agreements signed after 27 January 2026, and at most twelve installments within the year for earlier ones. Guarantee return and forfeiture dates are calculated, and project, expropriation file, highway, forest and excavation permit costs are entered as additional items. The final progress payment report and the annual EK-2 and EK-3 tables are downloaded from the system.
CPI and domestic PPI values are imported from the Central Bank's EVDS service on the Price Indices screen, and value calculations and indexing read from this table. Article 37 Projects define the project structure element, general ledger account and transaction types per characteristic.
The request is opened with its justification and moves to preparation through approval steps.
Take Over moves the equipment in the area into the estimate, which is priced and the value calculated.
The public interest decision, consent and permits are recorded, and the field team is assigned.
The field team draws the realization on the tablet, and the drawing is checked and compared with the estimate.
The payment schedule or installment plan is prepared, reports are produced and the record is completed.
Run transfer and user-built facility jobs with inventory and estimates on the map, on the same infrastructure as investment projects.
Keep public interest decisions, consent and permit details and the decision file on the job itself.
Get the transfer value, CPI indexing, installments and EK-2 / EK-3 tables from the system.
Under Article 37, an operating facility registered to someone else is taken over by the distribution company and its value is paid to the owner. Under Article 21, the user builds the facility on behalf of the distribution company and is repaid in installments. The two processes run on separate screens of the same module; each is switched on by its own parameter, and value and payment rules are calculated separately.
The estimate is priced with TEDAŞ positions, an overhead line km template or a lump sum. The value is calculated in the order of the organization's form by indexing unit prices with CPI and reducing them by facility age (1 − n/30); a facility older than 30 years is taken over at a nominal value. If the public interest decision or permit was obtained after the protocol, the payment schedule indexes the value with CPI up to the decision date. Each calculation is stored as a separate version.
A job with a finished estimate is sent to the expropriation unit, which locks the estimate value and drawing. Once the public interest decision, consent and permit details and the decision file are entered and a field team is assigned, the job moves to realization. Control engineers and surveyors draw the field realization on the GeoEner tablet app; after the drawing is checked and compared with the estimate, the job is sent to progress payment.
The repayment schedule is built from the agreement date: at most eight months and six equal installments for agreements signed after 27 January 2026, and at most twelve installments within the year for earlier ones. Guarantee return and forfeiture dates are calculated, and project, expropriation file and permit costs are entered as additional items. The final progress payment report and the annual EK-2 and EK-3 tables are produced by the system.
All products run on the same map, the same authorization model and the same asset records.
Investment Management
Optimize your electricity distribution investments
View detailsGIS · Network Topology
Network Inventory, Topology and Feeder Management
View detailsEngineering Analysis
Line Project Engineering Calculations
View detailsMaintenance Management
Digitize your asset maintenance processes
View detailsInvestment Management · Performance
Duration, Schedule and Cost Measurement for Investments
View detailsMaintenance Management · Performance
Maintenance Duration, Efficiency and Staff Scorecards
View detailsInspection Management
Inspection Management: Drone and AI Grid Inspection
View detailsPower Quality
Power Quality Management Software
View detailsGrid Monitoring
Power System Management
View detailsOutage Management
Outage & EPDK Reporting
View detailsDigital Twin · 3D
3D Grid Twin and Scenario Analysis
View detailsBusiness Intelligence
Management Dashboard, Benchmarking and Monitoring
View detailsField Operations
AKIM Field Management Application
View detailsFault Management
Fault Reporting and Response Management
View detailsEAM · Asset Registry
Plant Asset Registry and Warranty Tracking
View detailsEAM · Maintenance Planning
Calendar and Counter-Based Preventive Maintenance
View detailsEAM · Work Orders & Failures
Plant Work Orders, Failure Records and Service Reports
View detailsEAM · HSE & Permit to Work
Permit to Work, Lock-Out/Tag-Out and Certification Tracking
View detailsEAM · Reliability
Downtime Records, Availability and SCADA Connection
View detailsEAM · Contractors & SLA
Service Contracts, SLA and Contractor Work Sharing
View detailsEAM · Stock & Spare Parts
Plant Warehouses, Consumables and Spare Components
View detailsTrusted By