Plant Work Orders, Failure Records and Service Reports

Work order and failure management for plant assets: preventive, corrective and inspection work orders, assignment to field crews, checklist-driven field execution, operator acceptance, repair work orders from failure records, and one-click service report and acceptance protocol PDFs.

GeoEner EAM Work Orders and Failures follows every job on a plant asset from creation to operator acceptance. A work order is opened as preventive, corrective or inspection with one of four priority levels; it can be created manually, from a need on the maintenance calendar or from a failure record. A second work order can never be opened from the same maintenance need or failure. EAM work orders are kept separate from distribution grid work orders and isolated per tenant.

A work order is assigned to a user, and field crews can list only the work orders assigned to them. When work starts, the system checks that the required HSE permits are approved and valid, that the person doing the work holds a valid certificate for those permits, that every isolation point is verified, and that a valid crane reservation exists if a crane is required. In the field the checklist is filled in: check, measurement, text, photo and signature items; when an item deviates and is configured to do so, a failure record is opened automatically. Work cannot be completed until required items are answered and isolations are restored.

Technically completed work goes to the operator for acceptance; the operator accepts it or sends it back with a reason. Cancellation and rejection require a reason, and every status change is written to history with who, when and which note. The service report and the operator acceptance protocol are downloaded as PDFs from the work order detail; the report compiles work order, SLA, permit, isolation, checklist, material, failure, downtime and status history sections in the language of the request.

Failure records are kept with technical class, severity, reporting source and whether they caused a production stop. When a repair work order is opened from a failure, the failure counts as in repair; once the work order is accepted, it is resolved, and if the work order is cancelled, it goes back to open. A failure causing downtime and a maintenance work order requiring shutdown open and close the downtime record automatically.

Preventive, corrective and inspection; four priority levels
3 work types
Preventive, corrective and inspection; four priority levels
HSE permit, certificate, isolation verification and crane reservation
4 start conditions
HSE permit, certificate, isolation verification and crane reservation
Technical completion and operator acceptance as separate steps
Two-step closing
Technical completion and operator acceptance as separate steps
Service report and operator acceptance protocol
2 PDFs
Service report and operator acceptance protocol
Video

GeoEner EAM İş Emri ve Arıza at a Glance

Work order and failure management for plant assets: preventive, corrective and inspection work orders, assignment to field crews, checklist-driven field execution, operator acceptance, repair work orders from failure records, and one-click service report and acceptance protocol PDFs.

Capabilities

What GeoEner EAM İş Emri ve Arıza does

Module by module.

  • preventive · corrective · inspection

    Work order creation

    A work order is opened for a plant asset with type, priority, planned start and checklist template. A work order raised from a maintenance need inherits the plan's permit types, wind limits and crane requirement, and no second work order can be opened from the same source. Decommissioned assets cannot get work orders.

  • assignment · field crew

    Field crew assignment

    A work order is assigned to the user who carries out the job; field crews can list only the work assigned to them on the work orders screen. The assignee's certificates are checked against the permit types the job requires, both in the list and at start.

  • permit · certificate · isolation · crane

    Start and completion conditions

    Work cannot start unless required HSE permits are approved and valid, the assignee holds a valid certificate, isolation points are verified and, for crane jobs, a valid reservation exists. It cannot be completed until required checklist items are answered and isolations are restored.

  • measurement · photo · signature · deviation

    Field checklist

    Checklist items are answered while work is in progress, and photos and signatures are attached as files. A not-OK or out-of-range answer is marked as a deviation; if configured, a failure record of the defined severity is opened automatically and linked to the item.

  • completion · acceptance · rejection · history

    Operator acceptance

    Technically completed work goes to the operator for acceptance, who accepts it or sends it back with a reason. A reason is required for rejection and cancellation, and every status change is written to the work order history with user, time and note.

  • PDF · service report · acceptance protocol

    Service report and acceptance protocol

    The service report is generated server-side as a templated PDF with work order, SLA, work permit, isolation, checklist, material, failure, downtime and status history sections. The acceptance protocol is available only for technically completed or accepted work orders; texts follow the request language.

  • class · severity · source

    Failure records

    A failure is recorded as mechanical, electrical, hydraulic, control system, structural or external; minor, major or critical; reported manually, from inspection or from an alarm. Symptoms, root cause, detection time and closing note are kept, and critical failures are counted separately on the dashboard.

  • repair · downtime · status sync

    From failure to repair

    A repair work order is opened from a failure in one step. When it is opened the failure is in repair, and when it is accepted the failure is resolved; if the work order is cancelled, the failure reopens. A failure that causes downtime opens a downtime record from detection until resolution.

Process

How It Works

  1. 1

    Open — from maintenance, failure or manually

    The work order is opened with type, priority and checklist; permit and limit data carry over from the source.

  2. 2

    Assign — field crew

    The job is assigned to a user with suitable certificates; field crews list their own work.

  3. 3

    Start — safety conditions

    Work starts once permit, certificate, isolation and crane conditions are met.

  4. 4

    Execute — checklist

    Measurements, photos and signatures are entered; deviations open failures and isolations are restored.

  5. 5

    Accept — report and protocol

    The operator accepts the job; the service report and acceptance protocol are downloaded as PDFs.

Key Benefits

  • Work never starts before safety conditions are met
  • Field measurements and photos on the work order
  • Failure, repair and downtime linked together
  • Service report and acceptance protocol in one click

Who Is It For?

  • Plant operators

    See field work with checklist evidence and record acceptance or rejection with a reason.

  • Field and maintenance crews

    List the work assigned to you, fill in the checklist and attach photos and signatures.

  • O&M contractors and service companies

    Produce the service report and acceptance protocol from the work order; contracted work runs from the contractor screen.

Specifications

Technical Specifications

Scope
Work orders, field execution, operator acceptance, failure records and service reports for plant assets
Work order
Preventive, corrective, inspection; low, normal, high, urgent; manual, from maintenance needs, from failures
Status flow
Open → In progress → Completed → Approved; rejection and cancellation with reason; status history
Start conditions
Approved and valid HSE permit, valid certificate, verified isolation, crane reservation
Checklist
Check, measurement, text, photo, signature; deviation flag; automatic failure on deviation
Failure
7 technical classes, 3 severities, manual/inspection/alarm source, downtime impact; open, in repair, resolved, cancelled
Outputs
Service report and operator acceptance protocol (PDF, in the request language)
Platform
A GeoEner EAM module; separate from distribution work orders, isolated per tenant
FAQ

Frequently Asked Questions

When can a work order not be started?

A work order cannot start if the required HSE work permits are not approved and within their validity window, if the assignee lacks a valid certificate for those permit types, if not every isolation point has been verified, or if a crane job has no currently valid crane reservation. Work orders cannot be opened for decommissioned assets either.

What does the field crew record on a work order?

Field crews list the work orders assigned to them and fill in the checklist: check, numeric measurement, text, photo and signature items. An out-of-range measurement or a not-OK answer is flagged as a deviation, and if configured a failure record of the defined severity is opened automatically. Work cannot be completed until required items are answered and isolations are restored.

How are failure records and repair work orders related?

A repair work order is opened from a failure in one step, and no second work order can be opened from the same failure. When it is opened the failure is in repair; when the operator accepts the job the failure is resolved; if the work order is cancelled the failure reopens. If the failure caused a production stop, a downtime record is kept automatically from detection to resolution.

How are the service report and acceptance protocol produced?

Both are downloaded as PDFs from the work order detail. The service report contains work order, SLA, work permit, isolation, checklist, material, failure, downtime and status history sections. The acceptance protocol is available only for technically completed or operator-accepted work orders; texts are produced in the language of the request.

Product family

Other GeoEner Family Products

All products run on the same map, the same authorization model and the same asset records.

Trusted By

KÇETAŞ
ARAS
İGDAŞ
TCDD
MEB
İETT
HemenKurya
KÇETAŞ
ARAS
İGDAŞ
TCDD
MEB
İETT
HemenKurya
KÇETAŞ
ARAS
İGDAŞ
TCDD
MEB
İETT
HemenKurya

Ready to get started?

Start your free demo application today.