Calendar and Counter-Based Preventive Maintenance
Preventive maintenance planning for generation plants: calendar and counter rules per asset type, a maintenance-need engine that raises upcoming maintenance automatically, a ready template library for wind, solar, hydro and BESS, checklist templates, downtime windows, weather windows and crane reservations.
GeoEner EAM Maintenance Planning puts periodic maintenance of plant assets on rules. A maintenance plan applies to an asset type and can cover a single site or all of the tenant's sites. A calendar rule defines the days between two maintenance visits and how many days before the due date the need is raised; a counter rule defines the interval and lead value on a counter such as operating hours, energy produced or equivalent full cycles. A plan can have both rules, and each rule raises its own maintenance needs.
The maintenance-need engine runs at a set interval for every tenant and raises maintenance that is due or approaching. While a need is open for the same rule and asset, no new one is raised, and writing the same need twice is also blocked in the database. If the plan has a downtime window, for example the low-water season at a hydro plant, a due date outside the window is shifted to the first day of the month the window opens. On the maintenance calendar, needs are completed, skipped with a reason, or turned into a work order in one step.
The maintenance template library offers 18 ready templates: wind turbine semi-annual and annual service, gearbox oil change and blade inspection; module cleaning, inverter service, thermography and I-V curve measurement; hydro unit annual revision, major overhaul, generator partial discharge measurement, gate test and underwater intake inspection; BESS capacity test, rack thermal check, HVAC service and fire system check; and annual transformer maintenance. When a template is applied, the plan, its rules and checklist become the tenant's own records and can be edited freely.
Checklist templates consist of check, numeric measurement, text, photo and signature items; numeric items define an acceptance range, automatic failure creation on deviation and failure severity. A plan carries the HSE permit types required before work starts, the maximum wind speed for crews, whether a crane is required and the crane lifting limit. From the site's hourly wind forecast, consecutive suitable hours are calculated as weather windows; cranes are defined as site-bound or mobile, and overlapping reservations on the same crane are rejected.
Preventive maintenance planning for generation plants: calendar and counter rules per asset type, a maintenance-need engine that raises upcoming maintenance automatically, a ready template library for wind, solar, hydro and BESS, checklist templates, downtime windows, weather windows and crane reservations.
Module by module.
A plan applies to an asset type and covers one site or all of the tenant's sites. Expected duration, whether a shutdown is required, the checklist template and required HSE permit types are defined on the plan and carried over to work orders raised from it.
A calendar rule works with a day interval and lead days; a counter rule works with an interval and lead value on a counter such as operating hours, energy produced, start-stop, equivalent full cycles or yaw rotations. A plan can hold both rules.
The engine runs at a set interval for every tenant and raises maintenance needs that are due or approaching from active plans. No new need is raised while one is open for the same rule and asset, uniqueness is also enforced in the database, and an error in one tenant never stops the others.
A downtime window can be defined on the plan with a start and end month, and it can span the year end. A due date outside the window is shifted to the first day of the month the next window opens, and the original due date is kept.
Turbine semi-annual and annual service, gearbox oil, blade inspection; module cleaning, inverter service, thermography, I-V curve; hydro annual and major revision, generator partial discharge, gate test, underwater inspection; BESS capacity test, rack thermal check, HVAC and fire system; and annual transformer maintenance come ready. When applied, the plan, rules and checklist become the tenant's own records.
Items can be check, numeric measurement, text, photo or signature; a work order cannot be completed until required items are answered. Numeric items define a unit and acceptance range, and the severity of the failure raised on a not-OK or out-of-range answer. The template is copied into the work order, so later changes never affect open work orders.
The site's hourly wind forecast is entered manually or uploaded as CSV. The crew limit is compared with mean wind speed and the crane limit with gusts; consecutive suitable hours are shown as windows. Hours without a forecast are never counted as suitable.
Cranes are defined with capacity and the manufacturer's wind limit; a site-bound crane is reserved only for that site's work orders, a mobile crane for any of the tenant's sites. Two reservations on the same crane can never overlap, and work that needs a crane cannot start without a valid reservation.
A template is applied from the library or a new plan is opened for an asset type; a checklist is attached.
Day interval, counter interval, lead time and, if needed, a downtime window are defined.
The engine raises due and upcoming maintenance; needs appear on the maintenance calendar.
A suitable window is found from the wind forecast and a crane is reserved for work that needs one.
The need becomes a work order in one step; permit types, the checklist and limits carry over.
Manage preventive maintenance across your portfolio with one rule set and see overdue maintenance on the dashboard.
Plan maintenance around wind windows, crane availability and the low-water season.
Onboard a new site quickly with ready templates; work raised from plans can be shared through a contract.
Capabilities in development.
Today the hourly wind forecast is entered manually or uploaded as CSV; a connection to an external forecast service using site coordinates is prepared to plug into the same forecast provider contract.
Both. A maintenance plan can hold a calendar rule (day interval and lead days) and a counter rule (interval and lead value on a counter such as operating hours, energy produced or equivalent full cycles); each rule raises its own maintenance needs. The maintenance-need engine runs at a set interval for every tenant and never raises the same need twice.
The library has 18 templates: wind turbine semi-annual and annual service, gearbox oil and blade inspection; module cleaning, inverter service, thermography and I-V curve; hydro annual and major revision, generator partial discharge, gate test and underwater intake inspection; BESS capacity test, rack thermal check, HVAC and fire system; and annual transformer maintenance. An applied template becomes the tenant's own plan and can be edited freely.
A downtime window with a start and end month is defined on the maintenance plan, and it can span the year end. Maintenance falling due outside the window is shifted to the first day of the month the next window opens, and the original due date is kept. The low-water season at a hydro plant is a typical example.
Plans and work orders carry the maximum mean wind speed for crews and the crane lifting limit. The site's hourly wind forecast is entered manually or uploaded as CSV, and consecutive hours within these limits are shown as weather windows. Cranes are defined as site-bound or mobile, overlapping reservations on the same crane are rejected, and work that needs a crane cannot start without a valid reservation.
All products run on the same map, the same authorization model and the same asset records.
EAM · Asset Registry
Plant Asset Registry and Warranty Tracking
View detailsEAM · Work Orders & Failures
Plant Work Orders, Failure Records and Service Reports
View detailsEAM · HSE & Permit to Work
Permit to Work, Lock-Out/Tag-Out and Certification Tracking
View detailsEAM · Stock & Spare Parts
Plant Warehouses, Consumables and Spare Components
View detailsInvestment Management
Optimize your electricity distribution investments
View detailsMaintenance Management
Digitize your asset maintenance processes
View detailsInvestment Management · Performance
Duration, Schedule and Cost Measurement for Investments
View detailsMaintenance Management · Performance
Maintenance Duration, Efficiency and Staff Scorecards
View detailsInspection Management
Inspection Management: Drone and AI Grid Inspection
View detailsPower Quality
Power Quality Management Software
View detailsGrid Monitoring
Power System Management
View detailsOutage Management
Outage & EPDK Reporting
View detailsFacility Transfer · Art. 37 / 21
Article 37 Facility Transfer and Article 21 User-Built Facilities
View detailsGIS · Network Topology
Network Inventory, Topology and Feeder Management
View detailsDigital Twin · 3D
3D Grid Twin and Scenario Analysis
View detailsEngineering Analysis
Line Project Engineering Calculations
View detailsBusiness Intelligence
Management Dashboard, Benchmarking and Monitoring
View detailsField Operations
AKIM Field Management Application
View detailsFault Management
Fault Reporting and Response Management
View detailsEAM · Reliability
Downtime Records, Availability and SCADA Connection
View detailsEAM · Contractors & SLA
Service Contracts, SLA and Contractor Work Sharing
View detailsTrusted By