Duration, Schedule and Cost Measurement for Investments
The measurement screen of GeoEner Investment Management: stage durations and norms from pre-project creation to final acceptance, drawing durations, tender group schedule and cost compliance, scorecards for project leads, approvers, drafters and contractors, and stuck projects past their norm on one screen.
GeoEner Investment Performance is the Investment Performance screen in the GeoEner Investment Management menu; it is not a separate application but a measurement module that runs on the investment records and is switched on by an installation parameter. No separate calculation table is kept: metrics are calculated on request from pre-project and tender group histories, tender information, progress payments and drawing sessions. The screen is narrowed by date range (with presets such as this month, last month, this quarter, last quarter, this year, last year and last 12 months), province, district, project characteristic, project scope and KET filters; the date filter applies to the end event of the measured interval, and every value is compared with the previous period of equal length.
Process measurement splits an investment into nine stages: design, approval, pool waiting, tendering, contracting, site handover, construction, provisional acceptance and final acceptance, plus the end-to-end duration from creation to energization. For each stage it shows the median, 75th and 90th percentile of those completed in the period, and how many projects are waiting in the stage today and how many are past the norm. The stage norm is calculated as the organization-wide 90th percentile of stages completed in a look-back window; projects past this norm in their current stage appear in the Stuck Projects list. Drawing measurement gives, for pre-project, site handover and attachment drawings, the time from assignment to first drawing, from first drawing to approval request and the approval wait, as well as active drawing time and time per material from sessions built out of drawing actions on web and tablet.
On the delivery side, tender groups are tracked for schedule and cost. In schedule compliance, the ratio of physical progress to elapsed time gives the schedule index; the completion date is forecast assuming the current pace continues, and each group is classified as on track, at risk, late, completed on time or completed late. Cost compliance shows the approximate cost, contract fee, discount, additional work, progress payments and price differences, along with EPDK investment cap usage per project characteristic.
Scorecards rate project leads, approvers, drafters and contractors from 0 to 100 against the organization as a whole: the duration score compares the subject's median duration with the organization median, the quality score compares rejection, revision, delay and additional work rates with the organization rates, and the two are combined with an adjustable weight. The schedule, cost, scorecard and stuck project tabs are opened by separate permissions. The module is in use in GeoEner Investment Management.
The measurement screen of GeoEner Investment Management: stage durations and norms from pre-project creation to final acceptance, drawing durations, tender group schedule and cost compliance, scorecards for project leads, approvers, drafters and contractors, and stuck projects past their norm on one screen.
Module by module.
The numbers of pre-projects created, taken into the project pool, added to a tender group and energized in the period are shown next to the previous period of equal length. End-to-end, design and approval median durations, active and stuck project counts, active and late tender groups, additional work and revision rates, drawing sessions and active drawing hours are summarized; province comparison and the monthly trend are on the same tab.
The median, 75th and 90th percentile and previous-period median are calculated for the design, approval, pool waiting, tendering, contracting, site handover, construction, provisional acceptance and final acceptance stages and for the end-to-end duration. Stage dates come from pre-project and tender group history; negative durations are treated as data errors and excluded.
Each stage's norm is calculated as the organization-wide 90th percentile of stages completed in a look-back window; a stage without enough samples has no norm. Projects that exceed the norm in their current stage by an adjustable multiple are listed with stage entry date, days in stage, norm ratio, province, district, project lead and tender group, and can be filtered by stage.
For each drawing target, the days from assignment to first drawing, from creation to first drawing, from first drawing to approval request and from approval request to approval are measured. Drawing sessions give active drawing time per target and minutes per drawn material; targets sent for approval more than once or whose approval was withdrawn count toward the revision rate.
Drawing add, update and delete actions on web and tablet are grouped into sessions per user and target; a new session starts when the gap between two consecutive actions exceeds a threshold. For drawings sent offline from the tablet the device time is used, and a device clock too far ahead of the server is ignored. Project lead and control engineer assignments on the pre-project are kept with their periods.
Per tender group, contract, site handover, contractual and extended end dates and the actual completion date are shown with delay days and physical and financial progress. The ratio of physical progress to elapsed time is the schedule index; a group whose index falls below the threshold is considered at risk, and a forecast completion date is calculated from the pace so far.
Per tender group, the approximate cost (total of estimates), contract fee, discount ratio, additional work and its ratio to the contract, total progress payments and their ratio to the contract, and price differences are listed. The discount is calculated only where the discount function is enabled. Per project characteristic, financial progress is compared with the EPDK investment cap for the year the period ends.
Project leads are measured on assignment to first approval request, approvers on decision wait time, drafters on active drawing time, and contractors on the time from site handover to completion. The duration score is 50 when the subject's median equals the organization median, approaches 100 as it nears zero and is 0 at twice the median or more; rejection, revision, delay and additional work rates are scored the same way. Duration and quality scores are combined with an adjustable weight, and a subject with too few records gets no score.
Investment Performance is switched on by an installation parameter; schedule, cost, scorecard and stuck project tabs are granted to roles separately.
Web and tablet drawings are written to sessions, project lead and control engineer assignments to periods.
Investments to measure are chosen with date presets, province, district, characteristic, scope and KET filters.
Stage and drawing durations are tracked against norms, tender groups by schedule index, discount and additional work.
Scorecards are rated against the organization, and projects past their norm are listed with lead and stage.
See on one screen at which stage the investment process slows down and in which province and tender group schedule risk grows.
Compare design, drawing and approval durations with the organization norm; follow revision and rejection rates on the scorecard.
Track contractors' schedule compliance, additional work, progress payments and price differences per tender group.
No. Investment Performance is a screen in the GeoEner Investment Management menu and is switched on by an installation parameter. It needs no separate calculation table or extra data entry; metrics are calculated on request from pre-project and tender group histories, tender information, progress payments and drawing sessions. The schedule, cost, scorecard and stuck project tabs are opened by separate permissions.
Nine stages are measured: design, approval, pool waiting, tendering, contracting, site handover, construction, provisional acceptance and final acceptance, plus the end-to-end duration from pre-project creation to energization. For each stage the median, 75th and 90th percentile and the median of the previous period of equal length are given. The date filter applies to the end event of the measured interval.
Each stage's norm is calculated as the organization-wide 90th percentile of stages completed in a look-back window; a stage without enough samples has no norm. A project whose time in its current stage exceeds this norm by an adjustable multiple is considered stuck and is listed with stage entry date, days in stage, norm ratio, province, district, project lead and tender group.
There are separate scorecards for project leads, approvers, drafters and contractors. The duration score is 50 when the subject's median duration equals the organization median, approaches 100 as it nears zero and is 0 at twice the organization median or more. Rejection, revision, delay and additional work rates are turned into a quality score the same way. The two scores are combined with an adjustable weight; a subject without enough records gets no score.
All products run on the same map, the same authorization model and the same asset records.
Investment Management
Optimize your electricity distribution investments
View detailsMaintenance Management · Performance
Maintenance Duration, Efficiency and Staff Scorecards
View detailsEngineering Analysis
Line Project Engineering Calculations
View detailsBusiness Intelligence
Management Dashboard, Benchmarking and Monitoring
View detailsMaintenance Management
Digitize your asset maintenance processes
View detailsInspection Management
Inspection Management: Drone and AI Grid Inspection
View detailsPower Quality
Power Quality Management Software
View detailsGrid Monitoring
Power System Management
View detailsOutage Management
Outage & EPDK Reporting
View detailsFacility Transfer · Art. 37 / 21
Article 37 Facility Transfer and Article 21 User-Built Facilities
View detailsGIS · Network Topology
Network Inventory, Topology and Feeder Management
View detailsDigital Twin · 3D
3D Grid Twin and Scenario Analysis
View detailsField Operations
AKIM Field Management Application
View detailsFault Management
Fault Reporting and Response Management
View detailsEAM · Asset Registry
Plant Asset Registry and Warranty Tracking
View detailsEAM · Maintenance Planning
Calendar and Counter-Based Preventive Maintenance
View detailsEAM · Work Orders & Failures
Plant Work Orders, Failure Records and Service Reports
View detailsEAM · HSE & Permit to Work
Permit to Work, Lock-Out/Tag-Out and Certification Tracking
View detailsEAM · Reliability
Downtime Records, Availability and SCADA Connection
View detailsEAM · Contractors & SLA
Service Contracts, SLA and Contractor Work Sharing
View detailsEAM · Stock & Spare Parts
Plant Warehouses, Consumables and Spare Components
View detailsTrusted By