Plant Warehouses, Consumables and Spare Components
Stock of consumables and small spare parts in plant warehouses: a material catalog, warehouses per site, receipts, issues to work orders, returns, adjustments and transfers between warehouses, minimum stock levels, materials used on work orders and serial-numbered spare components in the asset tree.
GeoEner EAM Stock and Spare Parts tracks the material used in plant maintenance together with work orders. Consumables and small spare parts such as filters, oil, brushes and bearings are recorded in the material catalog with code, name and unit; a material can be linked to the asset types it suits, otherwise it counts as general material. Warehouses are defined per site; inactive warehouses and materials cannot have movements.
The stock balance is the sum of movements: receipts, issues to work orders, returns, adjustments and both sides of a transfer between warehouses are written as separate movements. Movements are never edited afterwards but offset by a reverse movement, and adjustments require a note. If any balance would go negative, none of the movements in the operation are written. A minimum stock level is defined for each warehouse and material.
Material is issued to a work order from a warehouse at the same site while the work is open, and a return can never exceed the issued quantity. The work order detail shows issued, returned and used quantities, which also go into the material section of the service report. Serial-numbered major components are kept not in stock but in the asset tree as the site's spares, and are picked from that list during component replacement, preserving their installation periods and warranty history.
Stock of consumables and small spare parts in plant warehouses: a material catalog, warehouses per site, receipts, issues to work orders, returns, adjustments and transfers between warehouses, minimum stock levels, materials used on work orders and serial-numbered spare components in the asset tree.
Module by module.
Consumables and small spare parts are recorded with code, name, unit and description. A material can be linked to the asset types it suits, otherwise it is general. A material in use cannot be deleted, and inactive materials accept no movements.
Each warehouse belongs to a site and is visible under site-scope permissions. Inactive warehouses accept no receipts, issues or transfers, and a warehouse in use cannot be deleted.
The balance is the sum of movements; movements are never edited but offset by reverse movements. The outgoing and incoming sides of a transfer are written as two paired movements, and transfers to the same warehouse are rejected. Adjustments require a note.
Movements in an operation are written together; if any warehouse-material balance would go negative, none are written and insufficient stock is reported.
A minimum quantity is defined for each warehouse and material pair; materials below that level are flagged on the balance screen and can be filtered.
Material is issued to an open work order from a warehouse at the same site, and returns can never exceed the issued quantity. Issued, returned and used quantities are listed on the work order and go into the material section of the service report.
Serial-numbered major components such as gearboxes, generators or inverters are kept not in stock but in the asset tree as the site's spares. They are listed by site and asset type and picked during component replacement; installation periods and warranty calculation rely on this history.
The material catalog and site warehouses are set up and minimum stock levels entered.
Incoming material is recorded as a receipt; transfers between warehouses are made as needed.
Material is issued to an open work order from a warehouse at the same site.
Unused material is returned; count differences are balanced with a noted adjustment.
Used material goes into the service report; materials below the minimum level are visible.
Track material in the plant warehouse and what was used on work orders in the same record.
See material falling below the minimum level and rebalance between sites with transfers.
Material used on contracted work is visible on the contractor screen when sharing is permitted.
Capabilities in development.
Today balances and movements are kept in the EAM database; external stock systems such as ERP are prepared to plug into the same stock provider contract.
Consumables and small spare parts such as filters, oil, brushes and bearings are kept in the material catalog with code, name and unit and tracked in site warehouses. Serial-numbered major components such as gearboxes, generators or inverters are kept not in stock but in the asset tree as the site's spares, and are picked from that list during component replacement.
No. The balance is the sum of receipt, issue, return, adjustment and transfer movements; the movements of an operation are written together, and if any warehouse-material balance would go negative, none of them are written. Movements are never changed afterwards but offset by reverse movements, and adjustments require a note.
Material is issued to an open work order from a warehouse at the same site; unused material is returned, and a return can never exceed the issued quantity. Issued, returned and used quantities are listed on the work order and go into the material section of the service report. On contracted work, material information is also visible to the contractor when sharing is permitted.
Today stock balances and movements are kept in the GeoEner EAM database. The stock layer is designed so that external stock systems such as ERP can plug in through the same provider contract; ERP integration is on the roadmap.
All products run on the same map, the same authorization model and the same asset records.
EAM · Asset Registry
Plant Asset Registry and Warranty Tracking
View detailsEAM · Maintenance Planning
Calendar and Counter-Based Preventive Maintenance
View detailsEAM · Work Orders & Failures
Plant Work Orders, Failure Records and Service Reports
View detailsInvestment Management
Optimize your electricity distribution investments
View detailsMaintenance Management
Digitize your asset maintenance processes
View detailsInvestment Management · Performance
Duration, Schedule and Cost Measurement for Investments
View detailsMaintenance Management · Performance
Maintenance Duration, Efficiency and Staff Scorecards
View detailsInspection Management
Inspection Management: Drone and AI Grid Inspection
View detailsPower Quality
Power Quality Management Software
View detailsGrid Monitoring
Power System Management
View detailsOutage Management
Outage & EPDK Reporting
View detailsFacility Transfer · Art. 37 / 21
Article 37 Facility Transfer and Article 21 User-Built Facilities
View detailsGIS · Network Topology
Network Inventory, Topology and Feeder Management
View detailsDigital Twin · 3D
3D Grid Twin and Scenario Analysis
View detailsEngineering Analysis
Line Project Engineering Calculations
View detailsBusiness Intelligence
Management Dashboard, Benchmarking and Monitoring
View detailsField Operations
AKIM Field Management Application
View detailsFault Management
Fault Reporting and Response Management
View detailsEAM · HSE & Permit to Work
Permit to Work, Lock-Out/Tag-Out and Certification Tracking
View detailsEAM · Reliability
Downtime Records, Availability and SCADA Connection
View detailsEAM · Contractors & SLA
Service Contracts, SLA and Contractor Work Sharing
View detailsTrusted By